| 01 |
Project economics and LCOE |
IRENA reported a global weighted-average LCOE of USD 0.044/kWh for newly commissioned utility-scale solar PV in 2023. |
Treat the figure as context, not a module-price target. Model local financing, installation, grid connection, operating costs, resource conditions, and system design separately. |
| 02 |
Design qualification |
IEC 61215 specifies design-qualification and type-approval testing for terrestrial PV modules. Qualification is not a guarantee of a particular service life or energy yield. |
Request current, model-specific test certificates and confirm that the tested construction matches the quoted module, including materials and bill of materials. |
| 03 |
Electrical safety |
IEC 61730 covers PV module safety qualification, including construction and testing requirements intended to reduce electrical and fire-related hazards. |
Verify applicable safety certifications for the destination market and ensure that certificates identify the exact product family and configuration being purchased. |
| 04 |
Rated power and test conditions |
Standard Test Conditions commonly specify irradiance of 1,000 W/m², cell temperature of 25°C, and an AM1.5 reference spectrum for PV performance measurement. |
Compare nameplate watts and power tolerance on the same test basis. Check the datasheet and independent flash-test documentation rather than comparing headline figures alone. |
| 05 |
Module efficiency and site fit |
Module efficiency relates rated power to module area under stated test conditions. Higher efficiency can reduce area needed for a given DC capacity, but does not by itself establish lower project LCOE. |
Compare efficiency alongside roof or land constraints, mounting layout, balance-of-system costs, shading, and expected energy yield for the actual site. |
| 06 |
Temperature performance |
PV module output varies with cell temperature. Datasheets report temperature coefficients, commonly for maximum power, open-circuit voltage, and short-circuit current. |
Compare the published coefficients and use site-specific operating temperatures in yield modelling, especially for hot climates and installations with limited ventilation. |
| 07 |
Power degradation and warranty |
Performance warranties are contractual and their guaranteed-output schedules differ by product and supplier; warranty duration alone does not show the guaranteed power at each year. |
Review the year-by-year output guarantee, measurement method, exclusions, claim process, and the legal entity responsible for honoring the warranty. |
| 08 |
Mechanical and environmental resilience |
IEC 61215 includes environmental and mechanical stress testing as part of module design qualification. Specific certified load ratings and test results depend on the module model. |
Match certified snow, wind, hail, and other relevant ratings to local design conditions. Confirm that mounting instructions and project engineering do not exceed the module’s limits. |
| 09 |
Supply-chain traceability |
Import, customs, and due-diligence requirements vary by jurisdiction and can change. Product origin and manufacturing-stage records are relevant to market access and procurement risk. |
Request traceability documentation for key materials and production stages, plus records needed for the destination market’s applicable import and due-diligence rules. |
| 10 |
End-of-life planning |
PV module collection, take-back, and recycling obligations differ across jurisdictions; there is no single global rule that applies to every project. |
Check local requirements and available collection or recycling arrangements, and include removal, transport, and end-of-life costs in long-term project planning. |